SPES Operational Handbook — Section 8

Appendices (Templates, Artifacts, and Institutional Memory)

Purpose of this section:
Provide ready-to-use tools that translate SPES judgment into durable institutional artifacts—without turning the role into paperwork production.

These appendices are:

  • optional but powerful,
  • lightweight,
  • and designed to survive staff turnover.

Tool A — Claims vs Non-Claims Ledger (Template)

Purpose
Prevent overstatement and institutional self-entrapment.

Used when

  • Allegations arise
  • Press inquiries arrive
  • Washington asks “what’s really going on”

Template

Issue:
Date / Time:
Decision deadline:

What We Can State (Verified)

  • …

What Is Alleged (Unverified)

  • …

What We Are Not Claiming

  • …

What We Do Not Yet Know

  • …

Implications if Facts Change

  • …

What this does not do

  • Decide truth
  • Assign blame
  • End debate

Tool B — Authority & Risk Ownership Map (Template)

Purpose
Prevent “everyone thought someone else had it.”

Used when

  • Authority is unclear
  • Ambassador unavailable
  • Multiple sections involved

Template

FunctionRole (not name)Status
Decision authority
Program facts
Press engagement
Legal exposure
Interim risk owner

Notes

  • Interim ≠ permanent
  • Silence still requires ownership

Tool C — Holding Language Framework

Purpose
Allow composure without commitment.

Used when

  • Facts incomplete
  • Press deadlines exist
  • Silence risky but denial unsafe

Core structure

  1. Acknowledge awareness
  2. Signal seriousness
  3. State review status
  4. Avoid confirmation/denial
  5. Set expectation for follow-up

Illustrative examples

“We are aware of the report and take the matter seriously. We are reviewing the information and will share updates when appropriate.”

What this does not do

  • Defend programs
  • Refute allegations
  • Predict outcomes

Tool D — Social Media Escalation Checklist

Purpose
Avoid reactive posting and accidental policy signaling.

Used when

  • Engagement spikes
  • Comments shift tone
  • Media begins quoting posts

Checklist

  • Is this post being treated as policy?
  • Are comments turning into allegations?
  • Is clarification likely to reduce or increase volatility?
  • Has Legal/PAO been looped?
  • Is documentation in place?

Decision options

  • Monitor
  • Clarify (pinned comment)
  • Pause engagement
  • Escalate
  • Edit/remove (with record)

Tool E — Media Product Archetypes (Correct vs Problematic)

Purpose
Build shared intuition without commentary.

Includes

  • Media notes (good / brittle)
  • Press releases (disciplined / overreaching)
  • Press guidance (bounded / absolute)
  • Q&A (safe / unsafe)

Use

  • Onboarding
  • Internal training
  • Pre-clearance calibration

What this does not do

  • Judge staff
  • Prescribe style

Tool F — Monitoring & Data Export Request Packages

Purpose
Enable defensible analysis without ad hoc scraping.

Includes

  • Facebook export request (posts, comments, insights, screenshots)
  • X/Twitter export request
  • Collection log template

Key principle

Raw data + context beats anecdotes.

What this does not do

  • Enable targeting
  • Enable profiling
  • Enable performance scoring

Tool G — American Spaces & Exchanges Tracking Sheet

Purpose
Prevent cumulative narrative drift.

Tracks

  • Space / program
  • Theme
  • Partner
  • Visibility level
  • External amplification
  • Risk notes

Used for

  • Quarterly review
  • Leadership brief
  • Pattern detection

Tool H — Audience & Influence Mapping Worksheet

Purpose
Ground discussions of “who this is for.”

Fields

  • Audience category
  • Typical interpretation
  • Primary risk
  • SPES watchpoints

Used when

  • Deciding tone
  • Choosing channels
  • Assessing silence risk

Tool I — Glossary (Operational Definitions)

Includes:

  • SPES
  • PAO
  • MATS
  • ICS
  • PDIP / PDCC
  • Attribution risk
  • Screenshot travel
  • Bounded confidence
  • Silence risk

Definitions are:

  • short,
  • functional,
  • non-theoretical.

Tool J — Minimum Viable Documentation Set

Purpose
Keep SPES work auditable but light.

Includes

  • Incident snapshot
  • One-page interim brief
  • Risk register entry
  • Decision trace email

Rule

If it didn’t leave a trace, it didn’t happen.